How to Prepare Your Home for a Kitchen or Bath Remodel (and the Best Time of Year in Richmond)

4 min read
Remodel design plans and material samples

The remodels that go smoothly are the ones where the homeowner knew what the first week would feel like before it started. Kitchen and Bath Experts has run hundreds of projects in occupied homes across Richmond, and this is the preparation we walk every client through, plus the honest answer on when to schedule.

The best time of year to remodel in Richmond

There is no bad season, but there are trade-offs:

  • January–March. Our most popular start window. Projects finish before spring entertaining and summer vacations, and the house is closed up anyway. Book in the fall to get these dates.
  • April–June. Mild weather makes it easy to open windows and run deliveries, and finished kitchens are ready for summer. Spring is also peak listing season, so pre-sale updates need to start earlier.
  • July–August. Heat and humidity are hard on an open house, but families away on vacation can hand over the keys and come back to a finished bathroom. Cabinet lead times are often shorter.
  • September–November. The rush to finish before Thanksgiving means these dates book early. A kitchen that must be done by the holidays should start by early September at the latest.

Whatever the season, the schedule is driven more by cabinet and material lead times than by weather. See our kitchen remodel timeline.

Four weeks before: decisions and ordering

  • Finalize every selection: cabinets, counters, tile, flooring, fixtures, hardware, paint. Late changes are the number-one cause of delays.
  • Confirm appliance models and delivery dates; appliances must be on site before countertop templating if they affect the layout.
  • Decide where the temporary kitchen will go and what will live in it.
  • Arrange pet care or a pet-free zone; crews come and go all day.
  • Tell your neighbors about the dumpster and the trucks; in the Fan and Church Hill, plan the on-street parking.

One week before: pack and clear

  • Empty every cabinet and drawer in the work area. Pack what you will not use in labeled boxes; keep a "daily" box with plates, cups, utensils, a cutting board and a knife.
  • Clear the rooms that crews walk through: hallway, foyer, and the path to the back door or garage.
  • Take down wall art and photos on walls shared with the work area; hammering travels.
  • Move anything fragile off shelves in adjoining rooms.
  • Note where the main water shutoff and electrical panel are, and tell the crew lead.

Set up a temporary kitchen

The difference between a tolerable remodel and a miserable one is a decent temporary kitchen. Set up in the dining room, the basement, the laundry room or the garage:

  • A folding table with a microwave, toaster oven or air fryer, electric kettle, coffee maker, and a hot plate or induction burner
  • The refrigerator, if it can be moved safely to a nearby room; otherwise a mini-fridge or cooler
  • Paper plates and cups for the first week, then wash dishes in the bathroom or laundry sink
  • A plan for a few nights of takeout; Richmond has no shortage of good options
  • Grill outside when weather allows

For a bathroom remodel, confirm the other bathroom is stocked and that everyone knows the shower schedule.

How we protect your home

  • Zipper-wall dust barriers sealing off the work area
  • Floor protection (ram board and runners) along every path crews use
  • HVAC registers in the work area covered, and air scrubbers on larger demolitions
  • Daily broom-clean and tools stowed at the end of each day
  • A single point of contact who tells you what is happening tomorrow

What a typical day looks like

Crews usually arrive between 7:30 and 8:30 a.m. and leave by 4 or 5 p.m., Monday through Friday. Noise is heaviest in the first week (demolition) and the cabinet-install week. Water and power to the work area are shut off during rough-in; we tell you the day before. Inspections happen at set milestones and take minutes. Expect a quiet day or two while waiting for countertops to be fabricated after templating.

Working from home during a remodel

Set up in the room farthest from the work area, ideally on another floor. Demolition and tile-cutting days are the loud ones; ask your crew lead which days those are and plan calls around them. Many clients schedule meetings elsewhere during demolition week.

Frequently asked questions

Should I move out during a kitchen remodel? Most families stay. A bathroom remodel with a second bath is easy; a kitchen remodel is manageable with a temporary kitchen. Moving out for a few days of demolition is a luxury, not a requirement.

How do I keep dust out of the rest of the house? Sealed barriers, covered vents, and a crew that cleans up daily. It will not be zero, but it should not be everywhere.

What if something unexpected is found? We stop, show you, give you a price and your options in writing, and continue only with your approval. See our older-homes guide for what tends to come up.

Start planning the start date

The earlier we talk, the better your pick of dates. Book a free in-home consultation and we will map a schedule that fits your calendar.

Free In-Home Consultation

Ready to talk about your project? Get a written proposal with design, materials and installation.

Request an Estimate
Free Estimate

Thirty years of kitchens and baths. Yours is next.

Tell us what you want and when you want it. We'll bring the design, the crew, and the schedule.